Loader Industry Chain Project

  • Budget:10billion
    Cooperation Mode:Sole proprietorship a...
  • Industry:High-end equipment manufacturing
    Jurisdiction:Yantai

Target Investors

Leading enterprises in related industries, top 500 enterprises, etc.

Market Potential

The projects should be designed and constructed by investors independently. The construction content includes: Engineering machinery and engine manufacturing, engineering machinery and tire manufacturing, standard parts production and manufacturing projects. After the project is put into operation, it is expected to realize an annual sales revenue of RMB 20 billion and a profit of about RMB 4 billion.

Advantages

(1) Market advantage: By virtue of strong product demand from Shahe Town and surrounding loader enterprises, the park enjoys a broad market. (2) Location advantage: Shahe Town Industrial Park is located at where the Yellow River Delta Efficient Ecological Economic Zone, the Shandong Peninsula Blue Economic Zone and the Jiaodong Peninsula High-end Industrial Cluster Zone meet, and can enjoy all the support policies brought by the three strategies at the same time. (3) Land resources: The park possesses 5,993 mu of land area that has obtained the certificate for state-owned land use right transfer. Now, 3,174 mu is planned, and 2,819 mu is left as reserved land for resident enterprises. (4) Transportation advantage: The park adjoins the planned Coastal High-grade Expressway along the Yellow River Delta, borders the Longtou Port-Laizhou Port along the Yellow River Delta in the north, and is ten kilometers away from the intersection of the Rongcheng-Wuhai Expressway, five kilometers away from the intersection of Dalailong Railway, and a 1.5-hour drive away from Qingdao, Yantai and Weifang airports in the south. (5) Infrastructure: The park invites the Urban Planning Institute of Shandong Jianzhu University for overall planning to build a provincial demonstration industrial zone based on the concept of green, eco-friendly and sustainable development; improves infrastructure construction to achieve "seven accesses and one leveling (accesses to traffic, water supply, water drainage, electricity, communication, heat and gas as well as land leveling)"; hardens Chengyuan Road, Chuangxin Road and Zhuoda South Road with a total hardened area of 40,800 square meters; installs 100 street lamps; builds green belts with a total green area of 9,900 square meters; and installs tap water, gas and power supply lines.

Preferential Policies

According to the project investment intensity, scale, output benefit, etc., corresponding preferential policies will be given.

Investment Requirements

Introducing tire manufacturers and standard parts manufacturers of certain scale.

Contact

Pan Weiwei   0535-2220076